Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs - MaRDI portal

Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs

From MaRDI portal
Publication:4595325

DOI10.1142/S0217595917500245zbMath1379.90008OpenAlexW2752506429MaRDI QIDQ4595325

Jinjiang Yuan, Qiu-Lan Zhao

Publication date: 30 November 2017

Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1142/s0217595917500245




Related Items (5)



Cites Work


This page was built for publication: Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs