The Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approaches
From MaRDI portal
Publication:4603920
DOI10.1051/ro/2016036zbMath1384.90064OpenAlexW2385296372MaRDI QIDQ4603920
Massimiliano Caramia, Lucio Bianco
Publication date: 23 February 2018
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: http://www.edpsciences.org/ro
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Continuous-time formulations for multi-mode project scheduling ⋮ Polyhedral Results and Branch-and-Cut for the Resource Loading Problem
Cites Work
- Scheduling of project networks
- Scheduling subject to resource constraints: Classification and complexity
- Scheduling of resource-constrained projects
- The project scheduling polyhedron: Dimension, facets and lifting theorems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
This page was built for publication: The Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approaches