Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network
DOI10.1155/2013/359074zbMath1296.90148OpenAlexW2094511478WikidataQ59023948 ScholiaQ59023948MaRDI QIDQ460499
Klaus-Dieter Thoben, Afshin Mehrsai, Hamid Reza Karimi, Bernd-Scholz Reiter
Publication date: 13 October 2014
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2013/359074
Transportation, logistics and supply chain management (90B06) Approximation methods and heuristics in mathematical programming (90C59) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Survey of multi-objective optimization methods for engineering
- Ranking fuzzy numbers with a distance method using circumcenter of centroids and an index of modality
- Fuzzy job shop scheduling with lot-sizing
- Migration policies, selection pressure, and parallel evolutionary algorithms
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Production planning with load dependent lead times
- Workload balancing capability of pull systems in MTO production
- A conceptual framework for outsourcing of materials handling activities in automotive: differentiation and implementation
- Forecasting for Items with Intermittent Demand
- AI 2005: Advances in Artificial Intelligence
This page was built for publication: Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network