Optimal scheduling of inspection times in a production process with a finite planning horizon
From MaRDI portal
Publication:4620170
DOI10.1002/ASMB.2201zbMath1410.90083OpenAlexW2525342966WikidataQ109045461 ScholiaQ109045461MaRDI QIDQ4620170
Publication date: 8 February 2019
Published in: Applied Stochastic Models in Business and Industry (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/asmb.2201
nonlinear integer programmingstochastic deteriorationoptimal inspection timesoptimal planning horizonmixed nonlinear integer programming
Mixed integer programming (90C11) Nonlinear programming (90C30) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35)
Uses Software
This page was built for publication: Optimal scheduling of inspection times in a production process with a finite planning horizon