Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

Scheduling twin robots on a line

From MaRDI portal
Publication:4632823
Jump to:navigation, search

DOI10.1002/NAV.21570zbMath1411.90143OpenAlexW2161522387MaRDI QIDQ4632823

Güneş Erdoğan, Maria Battarra, Gilbert Laporte

Publication date: 2 May 2019

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: http://opus.bath.ac.uk/41198/1/trsp_submitted_version.pdf


zbMATH Keywords

schedulingapproximation algorithmsrobotsexact algorithmsGantt chart


Mathematics Subject Classification ID

Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items (5)

Cooperative twin-crane scheduling ⋮ Pallet location and job scheduling in a twin-robot system ⋮ A generalized classification scheme for crane scheduling with interference ⋮ Scheduling cooperative gantry cranes with seaside and landside jobs ⋮ Approximation algorithms for the twin robot scheduling problem







This page was built for publication: Scheduling twin robots on a line

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4632823&oldid=18808453"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 7 February 2024, at 15:10.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki