Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

On equivalence between the proportionate flow shop and single‐machine scheduling problems

From MaRDI portal
Publication:4632911
Jump to:navigation, search

DOI10.1002/nav.21666zbMath1411.90155OpenAlexW2467205258MaRDI QIDQ4632911

Christos P. Koulamas, Shrikant S. Panwalkar

Publication date: 2 May 2019

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.21666


zbMATH Keywords

flow shopsingle-machineproportionate


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (6)

Due-window assignment scheduling in the proportionate flow shop setting ⋮ Proportionate flowshop scheduling with position-dependent weights ⋮ The proportionate flow shop total tardiness problem ⋮ Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights ⋮ Improved algorithms for proportionate flow shop scheduling with due-window assignment ⋮ A note on study on proportionate flowshop scheduling with due-date assignment and position-dependent weights




This page was built for publication: On equivalence between the proportionate flow shop and single‐machine scheduling problems

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4632911&oldid=18810565"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 15:15.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki