Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work

From MaRDI portal
Publication:4632917

DOI10.1002/nav.21684zbMath1411.90132OpenAlexW2343893962MaRDI QIDQ4632917

Du-Juan Wang, Cheng, T. C. Edwin, Yunqiang Yin, Chin-Chia Wu, Jianyou Xu

Publication date: 2 May 2019

Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.21684




Related Items (17)

Semi-online scheduling on two identical machines with a common due date to maximize total early workPareto-scheduling of two competing agents with their own equal processing timesTwo-machine flow-shop scheduling to minimize total late work: revisitedMinimizing total weighted late work on a single-machine with non-availability intervalsPolynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early workScheduling with competing agents, total late work and job rejectionSingle machine scheduling with common assignable due date/due window to minimize total weighted early and late workBicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late workThe study of group scheduling problems with general dual-position-based job processing timesSingle-machine preemptive scheduling with release dates involving the total weighted late work criterionA new perspective on single-machine scheduling problems with late work related criteriaSingle-machine scheduling with multi-agents to minimize total weighted late workMinimizing total late work on a single machine with generalized due-datesSingle-machine common due date total earliness/tardiness scheduling with machine unavailabilityFully polynomial time approximation scheme to maximize early work on parallel machines with common due dateA classification of dynamic programming formulations for offline deterministic single-machine scheduling problemsTwo-machine flow shop scheduling with a common due date to maximize total early work






This page was built for publication: Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work