CON/SLK due date assignment and scheduling on a single machine with two agents
From MaRDI portal
Publication:4632940
DOI10.1002/nav.21700zbMath1411.90166OpenAlexW2516974190MaRDI QIDQ4632940
Yunqiang Yin, Cheng, T. C. Edwin, Du-Juan Wang, Chin-Chia Wu
Publication date: 2 May 2019
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.21700
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39)
Related Items (23)
Single-machine serial-batch delivery scheduling with two competing agents and due date assignment ⋮ Proportionate flowshop scheduling with position-dependent weights ⋮ Multitasking scheduling problems with two competitive agents ⋮ Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs ⋮ Two‐agent scheduling with linear resource‐dependent processing times ⋮ Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work ⋮ Single-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobs ⋮ A note on a two-agent scheduling problem related to the total weighted late work ⋮ Two-Machine and Two-Agent Flow Shop with Special Processing Times Structures ⋮ Scheduling two projects with controllable processing times in a single-machine environment ⋮ Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives ⋮ A just-in-time scheduling problem with two competing agents ⋮ Flow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent Weights ⋮ Minmax due-date assignment on a two-machine flowshop ⋮ Bicriterion scheduling with a negotiable common due window and resource-dependent processing times ⋮ A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion ⋮ Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteria ⋮ Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights ⋮ Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads ⋮ A unified analysis for scheduling problems with variable processing times ⋮ Due date assignment and two-agent scheduling under multitasking environment ⋮ Due-window assignment scheduling with learning and deterioration effects ⋮ A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
This page was built for publication: CON/SLK due date assignment and scheduling on a single machine with two agents