A note on scheduling parallel machines subject to breakdown and repair
From MaRDI portal
Publication:4651709
DOI10.1002/NAV.10105zbMath1055.90035OpenAlexW2041774822MaRDI QIDQ4651709
Joseph Y.-T. Leung, Michael L. Pinedo
Publication date: 22 February 2005
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.10105
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (4)
Total completion time minimization on multiple machines subject to machine availability and makespan constraints ⋮ Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times ⋮ Bicriteria scheduling concerned with makespan and total completion time subject to machine availability constraints ⋮ Parallel machine makespan minimization subject to machine availability and total completion time constraints
This page was built for publication: A note on scheduling parallel machines subject to breakdown and repair