Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
From MaRDI portal
Publication:4655459
DOI10.1080/00207540310001595864zbMath1069.90047OpenAlexW1979011355MaRDI QIDQ4655459
No author found.
Publication date: 11 March 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540310001595864
Related Items (4)
Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling ⋮ Flow-shop scheduling with setup and assembly operations ⋮ Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times ⋮ Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system
Cites Work
- Unnamed Item
- Unnamed Item
- A survey of priority rule-based scheduling
- Due date assignment procedures with dynamically updated coefficients for multilevel assembly job shops
- Confidence Intervals for Steady-State Simulations: I. A Survey of Fixed Sample Size Procedures
- Improving job shop performance by coordinating dispatching rules
- A comparison of job shop dispatching rules using a total cost criterion
- New dispatching rules for shop scheduling: A step forward
- Dispatching rules for scheduling in assembly jobshops - Part 1
- Dispatching rules for scheduling in assembly jobshops - Part 2
- Sequencing CONWIP flow-shops: Analysis and heuristics
- A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
- Review of sequencing research
This page was built for publication: Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs