No-wait flowshops with bicriteria of makespan and total completion time

From MaRDI portal
Publication:4656717

DOI10.1057/palgrave.jors.2601403zbMath1139.90360OpenAlexW2017443180MaRDI QIDQ4656717

Ali Allahverdi, Tariq A. Aldowaisan

Publication date: 14 March 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601403




Related Items

A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtimeA note on minimizing maximum lateness in a two-machine no-wait flowshopTotal completion time with makespan constraint in no-wait flowshops with setup timesCommon due date assignment scheduling for a no-wait flowshop with convex resource allocation and learning effectA comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtimeAlgorithms for a two‐machine flowshop problem with jobs of two classesAn iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion timeMinimizing total tardiness in no-wait flowshopsFlow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent WeightsA bicriteria flowshop scheduling with a learning effectNo-wait flowshop scheduling problem with two criteria; total tardiness and makespanA survey of scheduling problems with no-wait in processHeuristics for no-wait flowshops with makespan subject to mean completion timeNew heuristics for no-wait flow shops with a linear combination of makespan and maximum latenessCOMPARISON OF SCHEDULING EFFICIENCY IN TWO/THREE-MACHINE NO-WAIT FLOW SHOP PROBLEM USING SIMULATED ANNEALING AND GENETIC ALGORITHMA two-machine no-wait flow shop problem with two competing agentsA robust two-machine flow-shop scheduling model with scenario-dependent processing times