Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity

From MaRDI portal
Publication:4658398
Jump to:navigation, search

DOI10.1057/palgrave.jors.2601079zbMath1131.90331OpenAlexW2019273572MaRDI QIDQ4658398

No author found.

Publication date: 16 March 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601079


zbMATH Keywords

maintenancemulti-echelon inventory controlcongestion externalitiesexpediting repair


Mathematics Subject Classification ID

Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)


Related Items (5)

A survey of the machine interference problem ⋮ Integrating inventory control and capacity management at a maintenance service provider ⋮ A typology and literature review on stochastic multi-echelon inventory models ⋮ Using repair priorities to reduce stock investment in spare part networks ⋮ REDUCING COSTS OF SPARE PARTS SUPPLY SYSTEMS VIA STATIC PRIORITIES







This page was built for publication: Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4658398&oldid=18864923"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 17:08.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki