Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times

From MaRDI portal
Publication:4658429
Jump to:navigation, search

DOI10.1057/palgrave.jors.2601110zbMath1131.90346OpenAlexW2042007290MaRDI QIDQ4658429

Ali Allahverdi, Tariq A. Aldowaisan

Publication date: 16 March 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601110

zbMATH Keywords

heuristicssetup timeno-waitcompletion timetwo-machine flowshop


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27)


Related Items

A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups, New heuristics for no-wait flowshops to minimize makespan., Concurrent flowshop scheduling to minimize makespan., A survey of scheduling problems with setup times or costs, A survey of scheduling problems with no-wait in process, Flowshop/no-idle scheduling to minimise the mean flowtime, COMPARISON OF SCHEDULING EFFICIENCY IN TWO/THREE-MACHINE NO-WAIT FLOW SHOP PROBLEM USING SIMULATED ANNEALING AND GENETIC ALGORITHM



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4658429&oldid=18864920"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 18:08.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki