Allocation of buffer spaces in a flexible manufacturing system: a model and a case example
From MaRDI portal
Publication:4658525
DOI10.1057/PALGRAVE.JORS.2601237zbMath1131.90328OpenAlexW1997897300MaRDI QIDQ4658525
No author found.
Publication date: 16 March 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601237
Related Items (1)
This page was built for publication: Allocation of buffer spaces in a flexible manufacturing system: a model and a case example