Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
From MaRDI portal
Publication:4661028
DOI10.1057/palgrave.jors.2601695zbMath1060.90033OpenAlexW1973595511MaRDI QIDQ4661028
Stuart I. Brown, José A. Ventura, Ronald G. McGarvey
Publication date: 4 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601695
Related Items
Total completion time with makespan constraint in no-wait flowshops with setup times ⋮ Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study ⋮ A survey of scheduling problems with setup times or costs ⋮ Some effective heuristics for no-wait flowshops with setup times to minimize total completion time ⋮ A survey of scheduling problems with no-wait in process ⋮ New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness ⋮ No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan