Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A two-stage heuristic for disassembly scheduling with assembly product structure

From MaRDI portal
Publication:4661103
Jump to:navigation, search

DOI10.1057/palgrave.jors.2601690zbMath1095.90048OpenAlexW2081043650MaRDI QIDQ4661103

Paul Xirouchakis, Dong-Ho Lee

Publication date: 4 April 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601690


zbMATH Keywords

heuristicsenvironmental studiesplanning and schedulingdisassembly systems


Mathematics Subject Classification ID

Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)


Related Items (6)

Capacitated disassembly scheduling with random demand ⋮ Heuristics for solving disassemble-to-order problems with stochastic yields ⋮ Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times ⋮ Towards circular economy in production planning: challenges and opportunities ⋮ On the cooperation of recycling operations ⋮ Disassembly scheduling: literature review and future research directions







This page was built for publication: A two-stage heuristic for disassembly scheduling with assembly product structure

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4661103&oldid=18863200"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 17:04.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki