Job scheduling with technical constraints
From MaRDI portal
Publication:4661129
DOI10.1057/palgrave.jors.2601673zbMath1095.90111OpenAlexW2005418079MaRDI QIDQ4661129
Publication date: 4 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601673
Related Items (4)
A disjunctive graph model and framework for constructing new train schedules ⋮ A flexible job shop scheduling approach with operators for coal export terminals ⋮ A sequencing approach for creating new train timetables ⋮ A flexible job shop scheduling approach with operators for coal export terminals -- a mature approach
This page was built for publication: Job scheduling with technical constraints