A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness
From MaRDI portal
Publication:4666773
DOI10.1080/0020754041233127044zbMath1069.90115OpenAlexW2081580328MaRDI QIDQ4666773
Publication date: 5 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754041233127044
Related Items (7)
Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ Scheduling on parallel identical machines to minimize total tardiness ⋮ The hybrid flow shop scheduling problem ⋮ Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study ⋮ Monadic convergence structures revisited ⋮ Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint ⋮ A TABU SEARCH ALGORITHM FOR A PIPE-PROCESSING FLOWSHOP SCHEDULING PROBLEM MINIMIZING TOTAL TARDINESS IN A SHIPYARD
Cites Work
- Branch and bound algorithm for the flow shop with multiple processors
- The two-machine flowshop scheduling problem with total tardiness
- Minimizing total tardiness in permutation flowshops
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
- A new dynamic programming formulation of (n x m) flowshop sequencing problems with due dates
- Minimizing tardy jobs in a two-stage hybrid flowshop
- Two-machine flowshop scheduling to minimize total tardiness
- Selecting Scheduling Heuristics Using Neural Networks
- Bottleneck-focused scheduling for a hybrid flowshop
- A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system
- The Total Tardiness Problem: Review and Extensions
- A flexible flowshop problem with total flow time minimization
- Minimizing tardiness in a two-machine flow-shop
This page was built for publication: A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness