A basic period approach to the economic lot scheduling problem with shelf life considerations
From MaRDI portal
Publication:4670274
DOI10.1080/00207540310001645165zbMath1099.90545OpenAlexW1968223677MaRDI QIDQ4670274
Dirk Pieter van Donk, C. A. Soman, Gerard J. C. Gaalman
Publication date: 18 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540310001645165
Related Items (5)
A common cycle approach for solving the economic lot and inspection scheduling problem ⋮ On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay ⋮ The stochastic economic lot scheduling problem: a survey ⋮ Economic lot scheduling problems incorporating a cost of using the production facility ⋮ Replenishment policy based on modified ant colony optimisation and statistical analysis under the pre-order penetration point
Cites Work
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Optimal cycle time and production rate in a family production context with shelf life considerations
- Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate
- A note on ‘Effect of production cost on shelf life’
- Incorporating planned backorders in a family production context with shelf-life considerations
- Manufacturing batch size and ordering policy for products with shelf lives
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
This page was built for publication: A basic period approach to the economic lot scheduling problem with shelf life considerations