Scheduling with product family set-up times: an application in TFT LCD manufacturing
From MaRDI portal
Publication:4671319
DOI10.1080/00207540410001708461zbMath1060.90651OpenAlexW1980526967MaRDI QIDQ4671319
No author found.
Publication date: 26 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540410001708461
Related Items (5)
Robust production and transportation planning in thin film transistor-liquid crystal display (TFT-LCD) industry under demand and price uncertainties ⋮ A rework-based dispatching algorithm for module process in TFT-LCD manufacture ⋮ Dispatching problems for parallel machines in the TFT‐LCD assembly process ⋮ Modeling the Material Allocation System for TFT-LCD Module Factories Based on Make-to-Stock Production ⋮ Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry
Cites Work
- Scheduling batches on parallel machines with major and minor set-ups
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Scheduling with batching: A review
- A computational study of shifting bottleneck procedures for shop scheduling problems
- Tabu Search—Part II
- An Application of Bin-Packing to Multiprocessor Scheduling
- On the Complexity of Scheduling with Batch Setup Times
- Scheduling batch processing machines with incompatible job families
This page was built for publication: Scheduling with product family set-up times: an application in TFT LCD manufacturing