Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
From MaRDI portal
Publication:4671328
DOI10.1080/00207540410001716552zbMath1060.90040OpenAlexW2008500926MaRDI QIDQ4671328
No author found.
Publication date: 26 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540410001716552
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items (1)
Cites Work
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- A neural network approach for batching decisions in wafer fabrication
- Applications of neural networks to solving SMT scheduling problems a case study
- Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
- Modelling, control and simulation of an IC wafer fabrication system: A generalized stochastic coloured timed Petri Net approach
- A modified shifting bottleneck procedure for job-shop scheduling
- Neurons with graded response have collective computational properties like those of two-state neurons.
This page was built for publication: Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability