Parallel machine scheduling considering a job-splitting property
From MaRDI portal
Publication:4671338
DOI10.1080/00207540410001720745zbMath1060.90038OpenAlexW1979805465MaRDI QIDQ4671338
No author found.
Publication date: 26 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540410001720745
Related Items (4)
Resource loading with time windows ⋮ Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness ⋮ A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property ⋮ Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers
Cites Work
- Scheduling jobs on parallel machines with sequence-dependent setup times
- A heuristic for the single machine tardiness problem
- Scheduling parallel machines to minimize total weighted and unweighted tardiness
- Parallel machine scheduling with splitting jobs
- A backward approach in list scheduling algorithms for multi-machine tardiness problems
- An integrated inventory model for a single product and its raw materials
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- Weighted-Tardiness Scheduling on Parallel Machines with Proportional Weights
- Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
- Heuristics for minimizing mean tardiness form parallel machines
- Scheduling with Deadlines and Loss Functions on k Parallel Machines
- Scheduling Jobs on Several Machines with the Job Splitting Property
This page was built for publication: Parallel machine scheduling considering a job-splitting property