Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes
From MaRDI portal
Publication:4671384
DOI10.1080/0020754042000270403zbMath1060.90025OpenAlexW1993317104MaRDI QIDQ4671384
Publication date: 26 April 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754042000270403
Related Items (3)
Characteristics of the research on reverse logistics (1995–2005) ⋮ Capacitated disassembly scheduling under stochastic yield and demand ⋮ A scatter search approach to sequence-dependent setup times job shop scheduling
Cites Work
- Quantitative models for reverse logistics: A review
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Optimal Power-of-Two Replenishment Strategies in Capacitated General Production/Distribution Networks
- Scheduling disassembly
- Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
- The economic lot scheduling problem under power-of-two policy
This page was built for publication: Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes