Scheduling for an arc-welding robot considering heat-caused distortion
From MaRDI portal
Publication:4671546
DOI10.1057/PALGRAVE.JORS.2601803zbMath1122.90339OpenAlexW1996330755MaRDI QIDQ4671546
No author found.
Publication date: 26 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601803
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (3)
Sequencing algorithms for multiple arc-welding robots considering thermal distortion ⋮ Manipulator motion planning for high-speed robotic laser cutting ⋮ Cluster-level operations planning for the out-of-position robotic arc-welding
This page was built for publication: Scheduling for an arc-welding robot considering heat-caused distortion