Forming effective worker teams for cellular manufacturing
From MaRDI portal
Publication:4674411
DOI10.1080/00207540110040466zbMath1060.90531OpenAlexW2095876209MaRDI QIDQ4674411
Yuanshu Huang, Ronald G. Askin
Publication date: 11 May 2005
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540110040466
Related Items (11)
Calibrating cross-training to meet demand mix variation and employee absence ⋮ Development and application of a worker assignment model to evaluate a lean manufacturing cell ⋮ Integer programming approaches to the multiple team formation problem ⋮ A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment ⋮ Heuristics for workforce planning with worker differences ⋮ The evolution of manufacturing cells: an action research study ⋮ The shift team formation problem in multi-shift manufacturing operations ⋮ Scheduling of unrelated parallel manufacturing cells with limited human resources ⋮ Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells ⋮ Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: a real case study from high-tech industry ⋮ Worker assignment in cellular manufacturing considering technical and human skills
This page was built for publication: Forming effective worker teams for cellular manufacturing