A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework
From MaRDI portal
Publication:4685811
DOI10.1007/978-3-319-89920-6_74zbMath1397.90195OpenAlexW2804791424MaRDI QIDQ4685811
No author found.
Publication date: 9 October 2018
Published in: Operations Research Proceedings (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-89920-6_74
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Scheduling of design projects with uncertain number of iterations
- Project scheduling under uncertainty: survey and research potentials
- Scheduling Markovian PERT networks to maximize the net present value
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints
- Unnamed Item
This page was built for publication: A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework