Minimizing the Expected Weighted Number of Tardy Jobs in the Stochastic Two-Machine Flow Shop
From MaRDI portal
Publication:4695014
DOI10.1080/01966324.1992.10737339zbMath0772.90051OpenAlexW2325047752MaRDI QIDQ4695014
Publication date: 11 October 1993
Published in: American Journal of Mathematical and Management Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/01966324.1992.10737339
Cites Work
- Minimizing the expected weighted number of tardy jobs in stochastic flow shops
- Scheduling stochastic jobs on a single machine subject to breakdowns
- On stochastic scheduling problems with due dates
- Stochastic Scheduling with Release Dates and Due Dates
- Minimizing the Expected Makespan in Stochastic Flow Shops