On the leadtime effect of two-stages production planning with random point demand
From MaRDI portal
Publication:4700808
DOI10.1080/09720510.1999.10700988zbMath1016.90014OpenAlexW2053747965MaRDI QIDQ4700808
Miao-Sheng Chen, Ying-Chieh Chen
Publication date: 24 August 2003
Published in: Journal of Statistics and Management Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/09720510.1999.10700988
This page was built for publication: On the leadtime effect of two-stages production planning with random point demand