Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem - MaRDI portal

Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem

From MaRDI portal
Publication:4706278

DOI10.1080/00207540210161650zbMath1038.90027OpenAlexW2082762028MaRDI QIDQ4706278

Rainer Leisten, Chandrasekharan Rajendran, Jose M. Framinan

Publication date: 1 October 2003

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540210161650




Related Items

Job-shop production scheduling with reverse flowsA simple and effective iterated greedy algorithm for the permutation flowshop scheduling problemOn insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problemA new set of high-performing heuristics to minimise flowtime in permutation flowshopsVariability of completion time differences in permutation flow shop schedulingNEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardinessA comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtimeA generalized constructive algorithm using insertion-based heuristicsNew simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problemRelationship between common objective functions, idle time and waiting time in permutation flow shop scheduling\(N\)-NEH+ algorithm for solving permutation flow shop problemsNew idle time-based tie-breaking rules in heuristics for the permutation flowshop scheduling problemsAn adaptive dynamic neighborhood crow search algorithm for solving permutation flow shop scheduling problemsAutomatic design of constructive heuristics for a reconfigurable distributed flowshop group scheduling problemImproved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilizationThe seeds of the NEH algorithm: an overview using bibliometric analysisA proposal for a hybrid meta-strategy for combinatorial optimization problemsA bicriteria flowshop scheduling with a learning effectAn improved NEH heuristic to minimize makespan in permutation flow shopsMinimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardinessScheduling blocking flowshops with setup times via constraint guided and accelerated local searchComparison of heuristics for flowtime minimisation in permutation flowshopsA comprehensive review and evaluation of permutation flowshop heuristicsNew heuristics for no-wait flow shops with a linear combination of makespan and maximum latenessMinimizing the total completion time in permutation flow shop with machine-dependent job deterioration ratesFlowshop-scheduling problems with makespan criterion: a reviewScheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristicsAn empirical analysis of the optimality rate of flow shop heuristicsThe distributed permutation flowshop scheduling problemImprovement heuristic for the flow-shop scheduling problem: an adaptive-learning approach