Heuristics and sequence-dependent set-up jobs in flow line cells
From MaRDI portal
Publication:4706280
DOI10.1080/00207540210163973zbMath1064.90533OpenAlexW2051890250MaRDI QIDQ4706280
Vijayender Reddy, T. T. Narendran
Publication date: 2003
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540210163973
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items
Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times, A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches, Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups, Flexibility analysis of a surface mount technology electronic assembly plant: An integrated model using simulation, A comprehensive review of flowshop group scheduling literature, Flow shop batching and scheduling with sequence-dependent setup times, A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups, Family scheduling with batch availability in flow shops to minimize makespan, A survey of scheduling problems with setup times or costs, The evolution of manufacturing cells: an action research study, Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times, Family-based dispatching: anticipating future jobs, Interdependent integrated network design and scheduling problems with movement of machines