Performance evaluation of a flexible machining/assembly system and routing comparisons
From MaRDI portal
Publication:4706282
DOI10.1080/00207540110119955zbMath1063.90526OpenAlexW2153139673MaRDI QIDQ4706282
Jiyin Liu, Lixin Tang, Aiying Rong, Zihou Yang
Publication date: 2002
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540110119955
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (6)
Loading, unloading and premarshalling of stacks in storage areas: survey and classification ⋮ An exact algorithm for the unrestricted block relocation problem ⋮ The blocks relocation problem with item families minimizing the number of reshuffles ⋮ The effects of a new selection operator on the performance of a genetic algorithm ⋮ The assignment of storage locations to containers for a container stack ⋮ New integer programming models for slab stack shuffling problems
Cites Work
This page was built for publication: Performance evaluation of a flexible machining/assembly system and routing comparisons