Worker assignment in cellular manufacturing considering technical and human skills
From MaRDI portal
Publication:4706291
DOI10.1080/00207540110118082zbMath1063.90521OpenAlexW1971567341MaRDI QIDQ4706291
Kim Lascola Needy, Wipawee Tharmmaphornphilas, Rona Colosimo Warner, Bryan A. Norman, Bopaya Bidanda
Publication date: 9 October 2003
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540110118082
Mixed integer programming (90C11) Production models (90B30) Discrete location and assignment (90B80)
Related Items (8)
Development and application of a worker assignment model to evaluate a lean manufacturing cell ⋮ Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment ⋮ A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment ⋮ Heuristics for workforce planning with worker differences ⋮ The evolution of manufacturing cells: an action research study ⋮ Scheduling of unrelated parallel manufacturing cells with limited human resources ⋮ Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: a real case study from high-tech industry ⋮ Worker assignment in cellular manufacturing considering technical and human skills
Cites Work
This page was built for publication: Worker assignment in cellular manufacturing considering technical and human skills