Scheduling production tasks in a two-stage FMS
From MaRDI portal
Publication:4706330
DOI10.1080/00207540210159608zbMath1064.90542OpenAlexW2153153846WikidataQ57387824 ScholiaQ57387824MaRDI QIDQ4706330
No author found.
Publication date: 2002
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540210159608
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (1)
Cites Work
- Some efficient heuristic methods for the flow shop sequencing problem
- The job shop scheduling problem: Conventional and new solution techniques
- A new constructive heuristic for the flowshop scheduling problem
- Optimal two- and three-stage production schedules with setup times included
- Flowshop scheduling with limited temporary storage
- An Evaluation of Flow Shop Sequencing Heuristics
- Shop Problems With Two Machines and Time Lags
- Cyclic Scheduling of Identical Parts in a Robotic Cell
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
This page was built for publication: Scheduling production tasks in a two-stage FMS