scientific article; zbMATH DE number 10435

From MaRDI portal
Publication:4713573

DOI<333::AID-NAV3220380305>3.0.CO;2-0 10.1002/1520-6750(199106)38:3<333::AID-NAV3220380305>3.0.CO;2-0zbMath0747.90049MaRDI QIDQ4713573

No author found.

Publication date: 25 June 1992


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items

A branch-and-bound algorithm for single-machine scheduling with batch delivery minimizing flow times and delivery costsBatch scheduling to minimize total completion timeAn exact dynamic programming algorithm for the precedence-constrained class sequencing problemA novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum latenessScheduling with batching: A reviewLower bounds and algorithms for flowtime minimization on a single machine with set-up timesMinimizing flowtime for paired tasksApproximation algorithms for problems in scheduling with set-upsDynamic programming algorithms for scheduling parallel machines with family setup timesAn online algorithm for a problem in scheduling with set-ups and release timesRobust scheduling on a single machine to minimize total flow timeA comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machinesBatch scheduling in a two-level supply chain -- a focus on the supplierHeuristic methods for the identical parallel machine flowtime problem with set-up timesA heuristic approach for single-machine scheduling with due dates and class setups.Two-machine flowshop scheduling with job class setups to minimize total flowtimeMathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimizationOnline Machine Scheduling with Family SetupsAn uncertain programming model for single machine scheduling problem with batch deliverySingle machine scheduling to minimize the setup time and the earlinessUsing profit maximizing scheduling models to structure operational trade-offs and manufacturing strategy issuesMinimizing maximum lateness with job families



Cites Work