Heuristic Interpretation of Infeasible Solutions to a Production Scheduling Problem in Cigarette Manufacture
From MaRDI portal
Publication:4717147
DOI10.1057/JORS.1996.124zbMath0863.90108OpenAlexW2002809555MaRDI QIDQ4717147
Publication date: 1 December 1996
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.124
Integer programming (90C10) Production models (90B30) Case-oriented studies in operations research (90B90)
This page was built for publication: Heuristic Interpretation of Infeasible Solutions to a Production Scheduling Problem in Cigarette Manufacture