Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

An asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop

From MaRDI portal
Publication:4717402
Jump to:navigation, search

DOI10.1080/00207729608929295zbMath0860.90074OpenAlexW1981545795MaRDI QIDQ4717402

No author found.

Publication date: 1 December 1996

Published in: International Journal of Systems Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207729608929295


zbMATH Keywords

branch-and-boundlower boundtotal flow timetwo-machine flow-shop schedulingtwo-phase heuristic algorithm


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function ⋮ A two-machine flowshop problem with two agents ⋮ A robust two-machine flow-shop scheduling model with scenario-dependent processing times



Cites Work

  • Unnamed Item
  • Some efficient heuristic methods for the flow shop sequencing problem
  • A new heuristic method for the flow shop sequencing problem
  • A new heuristic for the n-job, M-machine flow-shop problem
  • A dual algorithm for the one-machine scheduling problem
  • The Complexity of Flowshop and Jobshop Scheduling
  • A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4717402&oldid=18960718"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 21:42.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki