An asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop
From MaRDI portal
Publication:4717402
DOI10.1080/00207729608929295zbMath0860.90074OpenAlexW1981545795MaRDI QIDQ4717402
No author found.
Publication date: 1 December 1996
Published in: International Journal of Systems Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207729608929295
branch-and-boundlower boundtotal flow timetwo-machine flow-shop schedulingtwo-phase heuristic algorithm
Related Items
A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function ⋮ A two-machine flowshop problem with two agents ⋮ A robust two-machine flow-shop scheduling model with scenario-dependent processing times
Cites Work
- Unnamed Item
- Some efficient heuristic methods for the flow shop sequencing problem
- A new heuristic method for the flow shop sequencing problem
- A new heuristic for the n-job, M-machine flow-shop problem
- A dual algorithm for the one-machine scheduling problem
- The Complexity of Flowshop and Jobshop Scheduling
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem