Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal TWK-power due-date determination and sequencing

From MaRDI portal
Publication:4724420
Jump to:navigation, search

DOI10.1080/00207728708963943zbMath0615.90067OpenAlexW2099085330MaRDI QIDQ4724420

Cheng, T. C. Edwin

Publication date: 1987

Published in: International Journal of Systems Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207728708963943


zbMATH Keywords

single machineoptimal job sequencedeterministic processing timesTWK-power due-date assignment method


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (4)

Optimal assignment of due-dates for preemptive single-machine scheduling ⋮ Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem ⋮ Real-time prediction of order flowtimes using support vector regression ⋮ Real-time due-date promising by build-to-order environments




Cites Work

  • Due Date Assignment for Production Systems
  • Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
  • A Simulation Study of Predictable Due-Dates




This page was built for publication: Optimal TWK-power due-date determination and sequencing

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4724420&oldid=18970298"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 21:03.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki