Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Preselective strategies for the optimization of stochastic project networks under resource constraints - MaRDI portal

Preselective strategies for the optimization of stochastic project networks under resource constraints

From MaRDI portal
Publication:4740322

DOI10.1002/net.3230130102zbMath0504.90039OpenAlexW2076129982MaRDI QIDQ4740322

F. J. Radermacher, G. Igelmund

Publication date: 1983

Published in: Networks (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/net.3230130102



Related Items

New strategies for stochastic resource-constrained project scheduling, Schedule-induced posets, A classification of predictive-reactive project scheduling procedures, Project planning with alternative technologies in uncertain environments, A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations, Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming, Bi-objective multi-mode project scheduling under risk aversion, A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept, A pure proactive scheduling algorithm for multiple Earth observation satellites under uncertainties of clouds, Stochastic scheduling problems I — General strategies, A compact reformulation of the two-stage robust resource-constrained project scheduling problem, A Boolean satisfiability approach to the resource-constrained project scheduling problem, Scheduling of project networks, A min-flow algorithm for minimal critical set detection in resource constrained project scheduling, Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement, Considering project management activities for engineering design groups, Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem, The preemptive stochastic resource-constrained project scheduling problem, An approximate dynamic programming approach to project scheduling with uncertain resource availabilities, Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure, New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing, Stochastic task networks -- trading performance for stability, On the generation of circuits and minimal forbidden sets, Project scheduling under uncertainty: survey and research potentials, Scheduling Markovian PERT networks to maximize the net present value, Efficient priority rules for the stochastic resource-constrained project scheduling problem, Minimum-cost diagnostic strategies for \(k\)-out-of-\(n\) systems with imperfect tests, The proactive and reactive resource-constrained project scheduling problem, Resource-constrained project scheduling: Notation, classification, models, and methods, Resource allocation by means of project networks: Dominance results, Resource allocation by means of project networks: Complexity results, Stochastic scheduling problems II-set strategies-, Minimizing the expected makespan of a project with stochastic activity durations under resource constraints



Cites Work