A note on the influence of missing operations on scheduling problems
From MaRDI portal
Publication:4742542
DOI10.1002/nav.3800290316zbMath0505.90036OpenAlexW2071101134MaRDI QIDQ4742542
Publication date: 1982
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800290316
Related Items (6)
Openshop and flowshop scheduling to minimize sum of completion times ⋮ Shop scheduling problems with pliable jobs ⋮ Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics ⋮ Reversible-shop scheduling ⋮ Three stage generalized flowshop: Scheduling civil engineering projects ⋮ Proportionate flow shop: New complexity results and models with due date assignment
Cites Work
This page was built for publication: A note on the influence of missing operations on scheduling problems