Technical Note—Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem
From MaRDI portal
Publication:4745598
DOI10.1287/opre.31.2.401zbMath0507.90047OpenAlexW2145844949MaRDI QIDQ4745598
Edward A. Silver, Paul J. Schweitzer
Publication date: 1983
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.31.2.401
ill-posed problem formulationsnon-feasible boundary pointone machine multiproduct economic lot scheduling
Related Items (2)
Economic lot scheduling with uncontrolled co-production ⋮ On the economic lot scheduling problem with backlogging: The common cycle approach
This page was built for publication: Technical Note—Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem