STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME
From MaRDI portal
Publication:4810663
DOI10.1017/S0269964803174037zbMath1176.90258OpenAlexW2111265731MaRDI QIDQ4810663
Xian Zhou, Xiaoqian Sun, Xiaoqiang Cai
Publication date: 16 August 2004
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1017/s0269964803174037
Related Items (8)
Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns ⋮ A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines ⋮ Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns ⋮ Optimal rules for single machine scheduling with stochastic breakdowns ⋮ Single machine stochastic JIT scheduling problem subject to machine breakdowns ⋮ Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties ⋮ Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model ⋮ Scheduling deteriorating jobs on a single machine subject to breakdowns
This page was built for publication: STOCHASTIC SCHEDULING WITH PREEMPTIVE-REPEAT MACHINE BREAKDOWNS TO MINIMIZE THE EXPECTED WEIGHTED FLOW TIME