Scheduling the production of rolling ingots: industrial context, model, and solution method
From MaRDI portal
Publication:4814095
DOI10.1111/1475-3995.00427zbMath1108.90315OpenAlexW2001058791MaRDI QIDQ4814095
Norbert Trautmann, Christoph Schwindt
Publication date: 7 September 2004
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/1475-3995.00427
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (10)
A flow-based tabu search algorithm for the RCPSP with transfer times ⋮ Managing and modelling general resource transfers in (multi-)project scheduling ⋮ A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem ⋮ Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ On Eulerian extensions and their application to no-wait flowshop scheduling ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ GRASP and path relinking for project scheduling under partially renewable resources ⋮ A scatter search algorithm for project scheduling under partially renewable resources ⋮ Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
Cites Work
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Project scheduling with inventory constraints
- Batch scheduling in process industries: An application of resource-constrained project scheduling
- Advanced production scheduling for batch plants in process industries
- Scheduling with batching: A review
- Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions
- Unnamed Item
This page was built for publication: Scheduling the production of rolling ingots: industrial context, model, and solution method