Balancing and scheduling of flexible mixed model assembly lines
From MaRDI portal
Publication:481715
DOI10.1007/s10601-013-9142-6zbMath1304.90149OpenAlexW2014723306MaRDI QIDQ481715
Cemalettin Öztürk, M. Arslan Örnek, Semra Tunalı, Brahim Hnich
Publication date: 12 December 2014
Published in: Constraints (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10601-013-9142-6
schedulingdecompositionsequencingmixed integer programmingbalancingconstraint programmingmixed model assembly lines
Related Items (6)
Balancing stochastic type-II assembly lines: chance-constrained mixed integer and constraint programming models ⋮ Integer programming models versus advanced planning business software for a multi-level mixed-model assembly line problem ⋮ Mixed model line balancing with parallel stations, zoning constraints, and ergonomics ⋮ Operational extended model formulations for advanced planning and scheduling systems ⋮ Traveling worker assembly line (re)balancing problem: model, reduction techniques, and real case studies ⋮ A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines
Uses Software
Cites Work
- Unnamed Item
- Dynamic ordering for asynchronous backtracking on DisCSPs
- The sequence-dependent assembly line balancing problem
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Concurrent operations assignment and sequencing for particular assembly problems in flow lines
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- Mixed global constraints and inference in hybrid CLP--IP solvers
- Balancing assembly lines effectively -- a computational comparison
- Constraint satisfaction problems: Algorithms and applications
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
- Integrated production and material handling scheduling using mathematical programming and constraint programming
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
- Constraint programming and maths programming
- Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems
- Extending an Algebraic Modeling Language to Support Constraint Programming
- Constraint and Integer Programming in OPL
- The Role of Integer Programming Techniques in Constraint Programming's Global Constraints
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Balancing two-sided assembly lines with sequence-dependent setup times
- An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem
- Complementarity constraints as nonlinear equations: Theory and numerical experience
- Balancing and sequencing manual mixed-model assembly lines
- Simultaneous versus sequential loading and scheduling of flexible assembly systems
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- Search and strategies in OPL
- Integrating operations research in constraint programming
- Scheduling
- Principles and Practice of Constraint Programming – CP 2004
- Mathematical programming techniques in constraint programming: a short overview
This page was built for publication: Balancing and scheduling of flexible mixed model assembly lines