Accounting for idle capacity cost in the scheduling of economic lot sizes
From MaRDI portal
Publication:4823492
DOI10.1080/0020754031000164384zbMath1069.90040OpenAlexW2043616792MaRDI QIDQ4823492
Bibhas Chandra Giri, Il-Kyeong Moon
Publication date: 28 October 2004
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754031000164384
Sensitivity, stability, parametric optimization (90C31) Deterministic scheduling theory in operations research (90B35)
Related Items (1)
Cites Work
- Controllable production rates in a family production context
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- A note on 'deliberately slowing down output in a family production context'
- Reduced production rates in the economic lot scheduling problem
- Hybrid genetic algorithm for the economic lot-scheduling problem
- Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
This page was built for publication: Accounting for idle capacity cost in the scheduling of economic lot sizes