Scheduling n Independent Jobs on m Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis
From MaRDI portal
Publication:4835449
DOI10.1287/ijoc.7.1.63zbMath0822.90084OpenAlexW2000863312MaRDI QIDQ4835449
S. Thomas McCormick, Michael L. Pinedo
Publication date: 9 October 1995
Published in: ORSA Journal on Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/ijoc.7.1.63
Related Items
Optimal preemptive scheduling on uniform machines with discounted flowtime objectives ⋮ On the existence of schedules that are near-optimal for both makespan and total weighted completion time ⋮ Generating outpatient chemotherapy appointment templates with balanced flowtime and makespan ⋮ Best compromise solution for a new multiobjective scheduling problem ⋮ Multicriteria scheduling problems: a survey ⋮ The constrained minimum weighted sum of job completion times problem ⋮ Two-agent scheduling on uniform parallel machines with min-max criteria ⋮ Counting and enumeration complexity with application to multicriteria scheduling ⋮ Multicriteria scheduling