scientific article; zbMATH DE number 830013
From MaRDI portal
Publication:4859580
DOI<1251::AID-NAV3220420809>3.0.CO;2-Q 10.1002/1520-6750(199512)42:8<1251::AID-NAV3220420809>3.0.CO;2-QzbMath0841.90075MaRDI QIDQ4859580
Publication date: 7 January 1996
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (3)
Stochastically minimizing total flowtime in flowshops with no waiting space ⋮ Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness ⋮ Minimizing makespan on a single machine subject to random breakdowns
This page was built for publication: