Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations
From MaRDI portal
Publication:4861358
DOI10.1287/opre.43.3.444zbMath0839.90071OpenAlexW2007515360MaRDI QIDQ4861358
Devanath Tirupati, Hirofumi Matsuo, Javad H. Ahmadi, Reza H. Ahmadi
Publication date: 23 June 1996
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.43.3.444
Related Items
A new novel local search integer-programming-based heuristic for PCB assembly on collect-and-place machines ⋮ Optimal versus heuristic scheduling of surface mount technology lines ⋮ A planning and scheduling model for onsertion in printed circuit board assembly ⋮ Construction of component tapes for radial placement machines ⋮ Scheduling jobs of equal length: Complexity, facets and computational results ⋮ Process planning for circuit card assembly on a series of dual head placement machines ⋮ A model to optimize placement operations on dual-head placement machines ⋮ A taboo search heuristic for the optimisation of a multistage component placement system ⋮ The optimisation of the single surface mount device placement machine in printed circuit board assembly: a survey ⋮ Production planning problems in printed circuit board assembly ⋮ Enabling flexibility on a dual head placement machine by optimizing platform-tray-feeder picking operations ⋮ Optimization of printed circuit board manufacturing: Integrated modeling and algorithms