Scheduling target illuminators in naval battle-group anti-air warfare
From MaRDI portal
Publication:4862296
DOI<737::AID-NAV3220420503>3.0.CO;2-T 10.1002/1520-6750(199508)42:5<737::AID-NAV3220420503>3.0.CO;2-TzbMath0838.90078OpenAlexW2049222588MaRDI QIDQ4862296
Hanif D. Sherali, Donald D. Boyer, Youngho Lee
Publication date: 6 February 1996
Full work available at URL: https://doi.org/10.1002/1520-6750(199508)42:5<737::aid-nav3220420503>3.0.co;2-t
time-window job availabilitytotal weighted flow timemachine downtime side constraintsproduction floor shop schedulingsurface-to-air missiles
Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items
Interleaving two-phased jobs on a single machine ⋮ MIP modelling of changeovers in production planning and scheduling problems
Cites Work
This page was built for publication: Scheduling target illuminators in naval battle-group anti-air warfare