Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects

From MaRDI portal
Publication:4868787
Jump to:navigation, search

DOI10.1057/jors.1995.205zbMath0843.90054OpenAlexW2077329349MaRDI QIDQ4868787

Eugene Levner, Oded Z. Maimon, Konstantin Kogan

Publication date: 7 March 1996

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1995.205


zbMATH Keywords

makespansequencinggraph modelflexible manufacturing cellmachining centreseffects of transportationmobile transporting robot


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items

Cyclic multiple-robot scheduling with time-window constraints using a critical path approach ⋮ Scheduling in reentrant robotic cells: algorithms and complexity ⋮ A survey of scheduling problems with setup times or costs ⋮ Machine scheduling with transportation considerations ⋮ A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4868787&oldid=19228552"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 8 February 2024, at 05:22.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki