A heuristic method for the estimation of the project duration in a stochastic network scheduling
From MaRDI portal
Publication:4882999
DOI10.1051/RO/1995290302851zbMath0848.90057OpenAlexW2299573314MaRDI QIDQ4882999
Pierpaolo Pontrandolfo, A. C. Garavelli
Publication date: 13 October 1996
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/105110
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35)
This page was built for publication: A heuristic method for the estimation of the project duration in a stochastic network scheduling